Hardening

C² Cure

Combined curing agent and lithium hardener for newly placed concrete.

Why choose C²? →
Packaging20 L / 200 L
Coverage5–15 m²/L

Depends on surface porosity and finish. Confirm consumption on a test area.

Stock availability

Contact us for availability

C² Cure

When to choose this product

For newly placed, smooth, steel-trowelled concrete. Combines a temporary curing film with a lithium silicate hardener to support hydration and improve surface abrasion resistance.

Concrete already cured? Compare C² hardeners →

Product advantages

  • All-in-one curing agent and lithium hardener.
  • Improves abrasion-resistance, reduces surface dusting.
  • Reduces staining and color variations common to other curing methods.
More advantages
  • Reduces project timeline.
  • Easy to apply and fast drying. Slows water loss from fresh concrete; the TDS states compliance with ASTM C309 moisture-retention requirements.
  • Supports the performance and surface hardness of floors subsequently treated with C² Hard, C² Super Hard or C² Hard Blend. After the temporary film is removed, further Crete Colors protection can be applied.
  • Low odor and non-flammable according to the TDS. Follow the SDS for handling and personal protection.

For smooth, steel-trowelled concrete. This is a temporary curing treatment, not the final protective finish.

Technical information

Typical technical data
C² Cure — Typical technical data
AppearanceWhite, opaque liquid
Specific gravity1.07
pH11.4
Active content13%
Total solids13%
Shelf life in a tightly sealed, unopened container1 year
Flash point>100 °C (ASTM D3278)

Typical values from the manufacturer’s TDS; application details are in the full instructions.

Preparation and working conditions

Surface and air temperature4–38 °C

Use on freshly placed, smooth steel-trowelled concrete at 4–38°C. Remove standing water. Apply after finishing, preferably before cutting control joints; if already cut, remove all cutting dust.

Equipment

Use a low-pressure sprayer. Distribute evenly without puddles; avoid forming a fine mist.

Practical advice

Test a representative area with the equipment and preparation planned for the job. Let it dry before assessing the result and coverage.

Protect from water and foot traffic for 4–12 hours and limit traffic for 7 days. Keep the slab clean during construction; remove spills promptly and use breathable temporary covers when needed.

After 28 days, remove the temporary film with an auto-scrubber and black stripping pad using C² Degrease diluted 1:4 with water, or C² Maintenance at its recommended dilution. Then proceed with final hardening/protection.

Clean tools with fresh water before the product dries. Immediately wash splashes off glass, aluminium and other adjacent surfaces.

Storage and handling

Storage temperature15–32 °C

Store upright in sealed original containers in a cool, dry place. Close after dispensing. Follow local rules for unused product and packaging.

Product at work

C² Cure · curing and hardening0:16

Choose products for your floor

We can help select compatible products, equipment and quantities for your project.

Request a quote

Quantity calculator

Estimated quantity

AI technical expert

CRETE COLORS

Guidance on Crete Colors products

An AI assistant for choosing and using concrete floor treatment products. Ask about product differences, surface preparation, coverage, dilution and application steps.

What the answers are based on

Crete Colors technical data sheets (TDS), application instructions and other manufacturer product information. You can ask for the source document to check the details.