Preparation

C² Pin Fix

Filler for gaps, voids and small surface defects during concrete grinding.

Why choose C²? →
Coverage5–10 m²/L

Depends on surface porosity and finish. Confirm consumption on a test area.

Stock availability

Contact us for availability

C² Pin Fix

When to choose this product

For pinholes, small voids and surface imperfections exposed during concrete grinding. Mixes with grinding dust to fill defects and create a more uniform surface for polishing.

Product advantages

  • Automatically fills gaps, voids and pop outs during grinding operations.
  • Quickly cures to concrete hardness.
  • Treated surfaces polish faster and easier.
More advantages
  • Applied with a pump sprayer; can be diluted as specified for demanding site conditions. Filled pores help later colorants and protective treatments spread more evenly and reduce dirt traps.

Fills pinholes, small voids and microcracks during grinding. The TDS gives no maximum crack width; assess larger or moving cracks separately.

Technical information

Typical technical data
C² Pin Fix — Typical technical data
AppearanceMilky liquid
Specific gravity1.01
pH8.9
Active contentNot applicable
Total solidsNot applicable
VOC content100 g/L
Shelf life in a tightly sealed, unopened container2 years
Flash point>100 °C

Typical values from the manufacturer’s TDS; application details are in the full instructions.

Preparation and working conditions

Surface and air temperature10 ≤ T < 32 °C

Work at 10–32°C, during the later metal-bond or first resin-bond grinding stage, before densifying and polishing. Stir well. Use as supplied; up to 50% water may be added if diamonds gum up or conditions are hot and dry.

Equipment

Use a low-pressure sprayer. Distribute evenly without puddles; avoid forming a fine mist.

Practical advice

Test a representative area with the equipment and preparation planned for the job. Let it dry before assessing the result and coverage.

Allow 2–12 hours to dry before continuing the grinding process. Reconnect dust extraction for subsequent dry work. Clean tools with soap and water before the product dries.

Storage and handling

Storage temperature7–38 °C

Store upright in sealed original containers in a cool, dry place. Close after dispensing. Follow local rules for unused product and packaging.

Protect from freezing.

Choose products for your floor

We can help select compatible products, equipment and quantities for your project.

Request a quote

Quantity calculator

Estimated quantity

AI technical expert

CRETE COLORS

Guidance on Crete Colors products

An AI assistant for choosing and using concrete floor treatment products. Ask about product differences, surface preparation, coverage, dilution and application steps.

What the answers are based on

Crete Colors technical data sheets (TDS), application instructions and other manufacturer product information. You can ask for the source document to check the details.