Allow the slab to cure for at least 30 days, preferably 60–90 days or longer. Stabilise at service temperature; refrigerated areas need 7–14 days at operating temperature. Clean the full joint depth of dust, laitance, moisture, frost and coatings. Clean both sides with a diamond blade and vacuum; no primer is required.
Mixing
Dispense A and B at 1:1 by volume with dual-feed equipment or the kit’s cartridge mixer. Premix A; shake cartridges as instructed. Working time is about 1–2 minutes. In cool conditions keep the product at least 24°C; follow the kit instructions for setup.
Application
Fill bottom to top in one or two passes, avoiding trapped air and slightly overfilling. Trim flush once firm enough, from about 15 minutes depending on temperature. If material settles, remove the upper approximately 12 mm and refill. For dry grinding allow 3–4 hours at about 24°C; colder conditions need longer.
With your permission, we use Google Analytics to understand which pages are useful and roughly where visitors come from. You can browse without analytics. Privacy notice